Crane for USA 15 Cavern in CERN
The crane has now been installed at USA15 Cavern in CERN, which was built to hold the electronics for the Large Hadron Collider (LHC).
More infoThe crane has now been installed at USA15 Cavern in CERN, which was built to hold the electronics for the Large Hadron Collider (LHC).
More infoDockside infrastructure development for the wind farm at Mostyn Dock.
More infoOperations and maintenance base for the Gwynt y Môr wind farm at Mostyn Dock.
More infoStructural and Civil engineering services for a new business unit in Llangefni
More infoAn extension of the boat-building facility at Holyhead Marine Services.
More infoThe survey and assessment of existing workshop buildings at Holyhead Marine Services.
More info